Design & Supply

Design and supply for revamping of gas cleaning system in a wte plant (2011)

After a public tender W.T.E. obtained the contract for a major revamping of the MSW incineration facility. The plant was owned by AEM Gestioni Srl – Cremona, now a partner of A2A. The object of the tender was design, supply, install and start-up of: – high Dust SCR DeNOx unit, installed downstream of an exixting SNCR system –

Design and supply for revamping of gas cleaning system in a wte plant (2011) Read More »

Design and supply (2003)

AEM Gestione Srl ordered to W.T.E. the replacement of the system to feed furnace with medical waste, installed on the Line n.1 of the incineration plant in Cremona. The new system included an innovative solution to insure cooling with water collected from the existing boiler. Capacity: 2 lines of 17,8 MWth : 198 t/d x

Design and supply (2003) Read More »