Engineering to support permitting

Support and drafting of documents/New design of the pumping station of the water feeding system.(2022)

Support and direct drafting of all the documents required by law in order to obtain the review of the authorisation (A.I.A. Italian document) of the operating WtE plant (expertise, review overhaul and complement of documentation, compliance with the BAT). New design of the pumping station of the water feeding system.

Support and drafting of documents/New design of the pumping station of the water feeding system.(2022) Read More »

Engineering for permitting (2009)

W.T.E. was appointed to design and engineer a biomass plant, 18.7 MWe of capacity, in order to obtain public permission to build the plant and to deliver electric and thermal energy. This project was part of the initiative finalized to convert into an energy plant the Eridania-Sadam sugar mill, installed in Castiglion Fiorentino. The project

Engineering for permitting (2009) Read More »

Engineering for permitting (2009)

Actelios Spa, company owned by Falck Renewables Spa, commissioned to W.T.E. Waste To Energy the design of a biomass cogeneration plant with 17 MWe-60 MWth capacity. Scope of the work was to obtain  permitting named AIA and VIA from public authorities in Torremaggiore (FG) The high efficiency power plant would be fed by lignocellulosic biomass