Feasibility study 2.5 MWe wood chips Biomass to Energy system (2006)
2,5 MWe wood chips Biomass to Energy system
Feasibility study 2.5 MWe wood chips Biomass to Energy system (2006) Read More »
2,5 MWe wood chips Biomass to Energy system
Feasibility study 2.5 MWe wood chips Biomass to Energy system (2006) Read More »
1 MWe wood chips Biomass to Energy system. Chips from a short rotation forestry
Feasibility study 1 MWe wood chips Biomass to Energy system (2006) Read More »
Biomass to Energy system, based on two 12 MWt lines supplying 5 MWe plus additional power to a district heating system.
Feasibility study of Biomass plant 5MWe plus power to district heating (2006) Read More »
Ansaldo Caldaie SpA ordered to W.T.E. the engineering activity related to a new system to remove flying ashes in dense phase on a coal energy plant, 2 x 150 MW lines in Mohammedia, Morocco.
Engineering and procurement services (2006) Read More »
Development of an innovative system to control exhaust flue gas temperature and replacement of the existing lime milk gas reactor with a dry sodium bicarbonate reactor.
Feasibility study (2006) Read More »
W.T.E. carried out the design of a new parallel flow water steam superheaters (SH) for the existing boilers (2 x 17.5 tons/hour of steam) on the incineration plant owned by GEOFOR SPA. This solution was required in order to reduce the recorded heavy corrosions on the tubes due to clorine acid action.
Design of Superheater – MSW Incineration plant-Geofor Spa-PI (2006) Read More »
Progetto di rifacimento del sistema di depurazione fumi esistente (portata fumi 25.000 Nm3/h) sul termovalorizzatore a letto fluido di Macomer (NU). Ingegneria di base completa di specifiche tecniche per la realizzazione di due filtri a maniche, di due sistemi in circuito chiuso di preriscaldo e di bypass fumi, del sistema di estrazione/scarico ceneri, degli strumenti
Basic engineering for gas cleaning system, EfW Plant, Macomer (2005) Read More »
W.T.E. collaborate for an offer engineering related to a complete Biomass to Energy system.
Offer engineering, Biomass plant (2004) Read More »
Upgrade of APC system with installation of a new SCR deNOx system and replacement of the existing dry lime system with a new sodium bicarbonate one, AMSA Milano “Silla 2” MSW incineration plant
Detail Engineering for SCR deNOx system of wte plant (2004) Read More »
Study of a mechanical de-dusting system (cyclone) for ZnO dust, to be used in chemistry industries.
Study of a mechanical dedusting system for ZnO dust (2004) Read More »