Activity: Feasibility Study

Feasibility study

Development of an innovative system to control exhaust flue gas temperature and replacement of the existing lime milk gas reactor with a dry sodium bicarbonate reactor.

Feasibility study

Troubleshooting and availability improvement  of the thermal cycle installed on incineration plant owned by A.AM.P.S. in Livorno (turbogenerator 6.7 MWe gross). Following this study W.T.E. received the order to carry out the revamping of thermal cycle and auxiliaries.

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle

A.M.S.A. Spa owner of the MSW incineration plant in Milan, needed a technical and economical viability of the integration of a 3 x 61 MWt MSW incineration plant with a turbogas cycle. W.T.E. studied the impact on generation performances was developed by the analysis of 24 different operational functioning, related to weather conditions during the …

Feasibility study: integration of a 3 x 61 MWt MSW incineration plant with a combined turbogas cycle Read More »

Feasibility study

Feasibility study for replacement of the existing system to feed medical wastes on Waste to energy plant in Cremona. Owner AEM Gestioni Srl.