Prefeasibility study of revamping- Trezzo incineration plant- FALCK RENEWABLES (2020)
The preliminary study included: the technical expertise of the conservation status of the plant in order to evaluate the life-extension; the feasibility study ex dlgs 50/2015.
Prefeasibility study of revamping- Trezzo incineration plant- FALCK RENEWABLES (2020) Read More »