Feasibility study to convert furnace from oil to RDF (2013)

Feasibility study to convert a furnace, fed by diesel oil, to RDF (Refuse Derived Fuel), throughput 150 MWe W.T.E. designed a mathematical model based on characteristics of existing boiler and suitable to describe air suspended fuel burning and energy recovery in combustion chamber. Reduced steam thermodynamic parameters were assumed in order for the boiler tubes

Feasibility study to convert furnace from oil to RDF (2013) Read More »

Engineering of a new grinding-feeding system for incineration plant (2010)

W.T.E. provided to the Client, TOSSILO Spa, the project of a new grinding & feeding system to be installed on the existing incineration plant, in Macomer (Sardinia). The new feeding system was required suitable for non sorted waste brought to the plant with large dimension. The project developed opted for a significant modification of the

Engineering of a new grinding-feeding system for incineration plant (2010) Read More »

Consulting on malfunctioning of fluized bed on wte plant (2006)

Analisys of Fluised bed malfunctioning Studio di fattibilità per la sostituzione del forno a letto fluido esistente sulla Line 2- Termovalorizzatore di Macomer, della società TOSSILO Spa, con un forno a griglia di tipo non-adiabatico integrato con il generatore di vapore. Il progetto di revamping fornito da W.T.E. ha suggerito le modifiche  utili all’ottenimento di

Consulting on malfunctioning of fluized bed on wte plant (2006) Read More »

Pre-feasibility study of furnace replacement on EfW plant (2005)

W.T.E. was encharged to study the replacement of the existing furnace system of the MSW incineration plant managed by SE.VER.A in Castelnuovo G.na. The object of the prefeasibility study was to indicate: – the project of converting the existing furnace by its modification  from “adiabatic” to “non adiabatic” ,with the minimum adaptation of the other

Pre-feasibility study of furnace replacement on EfW plant (2005) Read More »