Consulting on Venturi system EfW plant-AEM Gestioni
Qualified consulting on the performances of the existing Venturi measuring system installed in the EfW plant owned by AEM Gestioni Srl- Cremona
Qualified consulting on the performances of the existing Venturi measuring system installed in the EfW plant owned by AEM Gestioni Srl- Cremona
CE Certification of a lifting beam for turbine rotor handling. MSW plant Silla2 Milan.
WTE has been in charge to develop technical documents in order to get the authorisation from Public Authority to use of a diathermic oil / steam boilers systems. The aim was to assure the compliance of the characteristics of existing components with parameters defined by law. SATTA & BOTTELLI, sited in the neirbourough of Milan, …
W.T.E. was appointed by Prima Srl, a Falck Renewables company, to study the optimization of the thermal cycle of the MSW plant, in Trezzo d’Adda, in order to power the future district heating network.
Carlo Gavazzi Impianti requested W.T.E. to deliver engineering services in order to complete the documents for tender concerning the thermal cycle (27 MWe) and the flue gas cleaning system of a new biomass to energy plant. W.T.E. calculated energy and mass balances both in- and off-design and delivered Process Flow Diagrams.
ECOSESTO Spa requested W.T.E. to give technical consulting concerning the calculation of feed in tariff after the start-up of the solar plant installed as an auxiliary sytem of the thermal cycle on the biomass plant in Rende (Calabria).
Preliminary study of a new thermal cycle and steam turbine capacity 1MWe. The distillery, D.E.T.A. located in Barberino Val d’Elsa, wanted to use its grapes residues and lees for energetic purposes.
Basic and Detailed Engineering to adapt the steam turbine and the thermal cycle of Padua MSW incineration plant to the district heating. ACEGAS APS, owner, appointed W.T.E. to study and design the delivery of heat from the existing thermal cycle to the future district heating. The evaluation had to be done considering all existing furnaces …
W.T.E. designed a new lay out of wte cooling towers, also delivering structural design of related reinforced concrete platform. Client: A.Am.P.S. Spa Livorno
Ecosesto SpA, coordinated by Actelios Spa, ordered to W.T.E. the design and the supply of a superheated steam boiler and auxiliary equipment for a power plant, located in Rende (Italy), fed by wood chips and olive residues. The plant was undergoing a complete revamping system in order: 1) to increase efficiency of energy recovery and …