Object: Thermal cycle

Engineering and permitting services

WTE has been in charge to develop technical documents in order to get the authorisation from Public Authority to use of a diathermic oil / steam boilers systems. The aim was to assure the compliance of the characteristics of existing components with parameters defined by law. SATTA & BOTTELLI, sited in the neirbourough of Milan, …

Engineering and permitting services Read More »

Flue gas cleaning system dimensioning

Offer engineering

Carlo Gavazzi Impianti requested  W.T.E.  to deliver  engineering services in order to complete the documents for tender concerning the thermal cycle (27 MWe) and the flue gas cleaning system of a new biomass to energy plant. W.T.E.  calculated energy and mass balances both in-  and off-design and delivered Process Flow Diagrams.    

low-temperature econimiser

Consulting

ECOSESTO Spa requested W.T.E. to give technical consulting concerning the calculation of feed in tariff after the start-up of the solar plant installed as an auxiliary sytem  of the thermal cycle on the biomass plant in Rende (Calabria).  

project thermal cycle 1MWe

Preliminary study: thermal cycle in a distillery

Preliminary study of a new thermal cycle and steam turbine capacity 1MWe. The distillery, D.E.T.A. located in Barberino Val d’Elsa, wanted to use its grapes residues and lees for energetic purposes.

Incineration plant tail end boiler

Engineering of new cooling towers

W.T.E. designed a new lay out of wte cooling towers, also delivering structural design of related reinforced concrete platform. Client: A.Am.P.S. Spa Livorno

steam condenser on incineration plant

Feasibility study of new steam condenser

A.Am.P.S., owner of the incineration plant in Livorno, ordered to W.T.E to develop the technical feasibility study of theremoval of the existing steam condenser and of the erection of the new one with improved performances.