Engineering of the upgrading of wte plant to be fed by RDF (2019)

W.T.E. carried out an engineering analysis of Fusina-Venezia incineration plant, originally designed to burn MSW and now to be fed by high LHV RDF.

W.T.E. has delivered furnace mass and energetic balances in all the characteristic points of combustion diagram, verifying the combustion parameters. W.T.E. has also designed the headers and nozzles of secondary air and gas recirculation.

The plant shall be repowered reaching 20 MWth of MCR.

 

 

 

CLIENT

EUROPOWER

LOCATION

Gallarate (VA)

COUNTRY

Italy

YEAR

2019

INDUSTRY

Waste to energy plant

OBJECT

Complete System

ACTIVITY

Engineering

ASSIGNMENTS

Basic Engineering
Refurbishment/Upgrade

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

WTE-Waste To Energy s.r.l.
Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.