Design of two HRSG on a waste to energy plant

W.T.E. signed a contract with ATZWANGER AG for the design of two boilers (20 tons/hour steam, T=370 øC, p=36 bar), to be installed at the AAMPS Livorno incineration plant.

The contract included the expediting activity, the design of the combustion control system and the training of operators and management of the plant.

The boilers were designed in order to run 8000 h/y without stop.

CLIENT

ATZWANGER SPA

LOCATION

Bolzano

COUNTRY

Italy

YEAR

2007

INDUSTRY

Waste to energy plant

OBJECT

Boiler, Furnace, Process & Combustion Control

ACTIVITY

Basic & Detailed engineering

ASSIGNMENTS

Basic Engineering
Detailed Engineering

We are using cookies to give you the best experience on our website.

You can find out more about which cookies we are using or switch them off in settings.

WTE-Waste To Energy s.r.l.
Powered by  GDPR Cookie Compliance
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

If you disable this cookie, we will not be able to save your preferences. This means that every time you visit this website you will need to enable or disable cookies again.