Biomass to Energy plant

Settlement of disputes (2021)

Settlement of disputes in an arbitration award between owner and supplier about some explosion recorded in the boiler installed in Powercrop Macchiareddu biomass to energy plant

Performance analysis (2016)

ECOSESTO Spa asked to W.T.E. to conduct an audit on energetic performance of the biomass to energy plant (16.5 MWe) operating in Rende(Calabria) in order to improve the energy efficiency of the plant. W.T.E.’ aim was to achieve the optimisation of combustion process through increased flexibility; the final aim was to allow the combustion of …

Performance analysis (2016) Read More »

Engineering service (2017)

Enhancement and Tuning Control Loops – The existing Combustion Control system was originally delivered by W.T.E. to Dister Energia for the biomass plant with 24 MWth of capacity operating in Faenza (FC).