Waste to energy plant

Consulting about malfunctioning during commissioning of EfW plant (2005)

During the start-up and operational tuning of the new air treatment system installed on the MSW incineration plant owned by ACSM (CO), the supplier detected some defects and malfunctionings. W.T.E. delivered to Aster, the supplier, the study of the process in which the origin of failures were identified and possible solutions were suggested.  

Consulting about malfunctioning during commissioning of EfW plant (2005) Read More »

Pre-feasibility study of furnace replacement on EfW plant (2005)

W.T.E. was encharged to study the replacement of the existing furnace system of the MSW incineration plant managed by SE.VER.A in Castelnuovo G.na. The object of the prefeasibility study was to indicate: – the project of converting the existing furnace by its modification  from “adiabatic” to “non adiabatic” ,with the minimum adaptation of the other

Pre-feasibility study of furnace replacement on EfW plant (2005) Read More »

Feasibility study (2005)

Troubleshooting and availability improvement  of the thermal cycle installed on incineration plant owned by A.AM.P.S. in Livorno (turbogenerator 6.7 MWe gross). Following this study W.T.E. received the order to carry out the revamping of thermal cycle and auxiliaries.

Feasibility study (2005) Read More »