Tuning of a SNCR DeNOx system (2011)
Tuning of a SNCR DeNOx system in a biomass plant – Faenza – Dister Energia.
Tuning of a SNCR DeNOx system (2011) Read More »
Tuning of a SNCR DeNOx system in a biomass plant – Faenza – Dister Energia.
Tuning of a SNCR DeNOx system (2011) Read More »
Moncada Energia, owner of a biomass plant, capacity 15,3 MWth per 3 lines, asked to W.T.E. a consulting concerning the analysis of main problems arised during the run and the review of the complete system with a new process combustion and control system. W.T.E. studied malfunctionings and delivered a preliminary project with improvements and budget.
Consulting on biomass to energy plant 15,3 MWth, 3 lines (2011) Read More »
Development of a software for the predictive monitoring of boiler fouling to: adjust in real-time of the soot blowing cycles predict concretions and build-up schedule plant downtime for cleaning operation W.T.E. provided software to process boiler bundles thermodynamic data in order to advice operators about fouling.
Predictive monitoring of boiler fouling (2010) Read More »
Design, engineering, start-up and testing of a new control system, to be applied on an anaerobic digestion plant, on following biogas handling and on related burners, already installed in a biomass furnace.
Basic Engineering, including technical specifications and offer’s alignment, was delivered to COMART, a company of Gruppo Tozzi . The scope of the project was the installation of a new Biomass Plant with 50 MWt maximum capacity, fed by wood chips and olive oil residues. The site of the new plant was nearby Reggio Calabria.
Basic Engineering of a 49,5 MWt Biomass plant (2009) Read More »
W.T.E. organised a training course which would prepare the operators to the conduction of the plant. The course was focused on three items: furnace:Â Â combustion and control of pollutant emission; maintenance combustion diagram combustion control and steam production.
Engineering services (2010) Read More »
Combustion tests at the start up plant
Combustion tests at the start up plant (2010) Read More »
Preliminary feasibility study for revamping of an obsolete Biomass to Energy plant
Pre-feasibility study fo the revamping of an obsolete Biomass to Energy plant (2010) Read More »
W.T.E. was appointed to design and engineer a biomass plant, 18.7 MWe of capacity, in order to obtain public permission to build the plant and to deliver electric and thermal energy. This project was part of the initiative finalized to convert into an energy plant the Eridania-Sadam sugar mill, installed in Castiglion Fiorentino. The project
Engineering for permitting (2009) Read More »
Comparison between the traditional HP steam Rankine cycle and ORC (Organic Rankin Cycle), with particular reference to small Biomass to Energy plants (1 MWe).
Pre-feasibility study 1MWe biomass plant (2009) Read More »