Developing bid documents to purchase a new biomass to energy plant (2021)
Developing bid documents including technical specifications to purchase biomass to energy plant, including furnace, boiler, gas cleaning systems, and biomass handling systems
Developing bid documents including technical specifications to purchase biomass to energy plant, including furnace, boiler, gas cleaning systems, and biomass handling systems
Feasibility study to life extension and BAT adaptation of Trezzo incineration plant including engineering for organic slurry receiving, storage, and handling to co-combustion to two exisiting wastetoenergy lines
Developing bid documents including technical specifications to purchase two biomass to energy plant (4 MWt and 3 MWt), including furnace, boiler, gas cleaning systems, and biomass handling systems
Preliminary engineering of a heating system to dry refractory lining following automatically an assigned thermal profile.
Analysis, control, and modifications of control logic for an industrial dry gas cleaning system.
A.S.A. Azienda Servizi Ambientali is an Italian public company whose core business focuses on urban water complete systems both in Livorno and in neighbouring municipalities. A.S.A. primary area includes also sludge sewage digesters and final disposal of residue slurries. According to a Public Authority request and following a W.T.E.Srl preliminary study, A.S.A asked W.T.E.Srl to …
Performance analysis in co-combustion sewage sludge/RSU (2019) Read More »
W.T.E. delivered basic and detailed engineering to upgrade an existing biomass boiler with 57 MWt at MCR and to build a new thermal cycle with a turbo-generator 14.5 MWe capacity. The project included also the revamping engineering of the existing boiler with the installation of a new superheater, able to deliver higher steam temperature, the …
Repowering of biomass boiler in a chemical factory (2018) Read More »
A major Italian company, operating in the field of incineration and renewable energy, required W.T.E. to study the life extension of boilers installed on an existing incineration plant. Later, the analysis was extended to the whole plant. W.T.E. carried out the study for residual useful life evaluation through an analysis of ordinary and extraordinary maintenance …
Residual useful life prediction of boilers on a wte plant (2018) Read More »
W.T.E. carried out an engineering analysis of Fusina-Venezia incineration plant, originally designed to burn MSW and now to be fed by high LHV RDF. W.T.E. has delivered furnace mass and energetic balances in all the characteristic points of combustion diagram, verifying the combustion parameters. W.T.E. has also designed the headers and nozzles of secondary air …
Engineering of the upgrading of wte plant to be fed by RDF (2019) Read More »
The client, owner of the wte plant Silla2 in Milan, appointed W.T.E. to provide a solution for the treatment of the primary air, drawn from the refuse pit of the plant. WTE designed a system in two stages. A self-cleaning filter, operating as metallic sieves, was recommended. As the plant needed a deeper cleaning system …