Flue Gas Cleaning System

Engineering services

Offer engineering (2013)

Carlo Gavazzi Impianti requested  W.T.E.  to deliver  engineering services in order to complete the documents for tender concerning the thermal cycle (27 MWe) and the flue gas cleaning system of a new biomass to energy plant. W.T.E.  calculated energy and mass balances both in-  and off-design and delivered Process Flow Diagrams.    

Offer engineering (2013) Read More »

Feasibility study of a CHPP plant: from coal to RDF/biomass (2014)

SIA Ventspils Siltum, Multitutility of  Ventspils City (Latvia) is in charge of managing the urban district heating. In 2014 Ventspils Siltum commissioned  W.T.E.  to carry out the technical-economic feasibility study to revamp an existing furnace-boiler, originally designed to be fed by coal following Russian technology. To reduce coal consumption W.T.E. studied the conversion to RDF

Feasibility study of a CHPP plant: from coal to RDF/biomass (2014) Read More »

SCR standardisation on GT HRSG boilers (2015)

The Client requested W.T.E. to provide mechanical and thermodynamic standardisation, performance test procedure and erection engineering analysis about boilers to be revamped by SCR deNOx systems, to treat flue gas released from a natural gas (gas turbine). W.T.E. delivered technical specifications for work instruction, SCR catalyst, ammonia injection, storage and dosing, ammonia grid, flow control

SCR standardisation on GT HRSG boilers (2015) Read More »